Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 22, 2023     Firewall Insulation - (4 hours)       Category: Firewall
Removed all the accessories from the firewall. Dimpled the holes on the Oil Cooler support even if not strictly necessary as i will be sandwiching steel/fiberfrax when riveting.
Reinstalled the Oil filter recessa after dimpling and riveting the flanges to itself.
Asked Chiara to do the riveting and everything turned out fine.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.